    9427 - CrematorsProject Overview

    To remove three existing cremators; install two new ones (one to accommodate larger coffins); install flue gas treatment plant to comply with DEFRA's requirements under PG5/2(04).  In doing so achieve 100% abatement of mercury and other specified dioxins by 31 December 2012.

    Achievements of the Project

    Two new cremators installed. Flue gas treatment compliant with PG5/2(04) has been installed.  A system to recover heat from the process installed and operating providing heat  to the Chapel and Administration Office to reduce gas consumption.


    The cost of gas has reduced by over 30% despite rising energy costs and a 5% increase in activity (funerals)